Customs House Boat Ramp Upgrade, Murtho

Concept and detailed design of an upgraded boat launching facility at Customs House on the River Murray at Murtho, South Australia. The design keeps the facility usable while the Lock 6 weir pool is raised and lowered for environmental outcomes.
The challenge
The Department for Environment and Water is changing the way Lock and Weir 6 on the River Murray is operated, raising and lowering the weir pool to help restore more natural wetting and drying patterns across the Riverland floodplain. A review found that the boat launching facility at Customs House near Murtho would stop working across part of that range. It is the main river access point in this stretch of the Murray for recreational boats, houseboat operators and emergency services, so Magryn was engaged to design an upgrade that stays functional across the managed water levels.
Our approach
The design started from data rather than a layout: survey of the bank and riverbed, river level records and a geotechnical investigation. Controlling levels were set from that record so the facility works across the operating range of the river. Loads came from conditions the site genuinely produces, such as river flow, vessel wash and debris, and construction methods were considered from the outset so the works can be built practically in and beside the water.
The outcome
The design delivers an upgraded ramp, a floating pontoon and a reconfigured parking area that keep the facility working through weir pool changes and high river flows. This means the Department for Environment and Water can operate Lock 6 for environmental benefit without taking river access away from the Murtho community.
Project gallery
Similar work
Talk to us about a similar project, or browse more of our work.

