Tumby Bay Foreshore Coastal Protection Design

Coastal alignment study and detailed design of coastal protection along the Tumby Bay township foreshore on Eyre Peninsula, protecting the town from erosion and storm inundation while keeping the beach open and accessible to the community.
The challenge
The Tumby Bay foreshore is the centre of town life on the eastern coast of Eyre Peninsula, carrying the jetty, the cafe precinct, parks, playgrounds and the coastal path that links them. It has also been losing ground for decades. Dunes have eroded back, ageing seawalls through the township are overtopped during storms, and the lowest lying sections of the foreshore already flood on high storm tides. The District Council of Tumby Bay engaged Magryn to determine where a new coastal protection structure should sit, and then to design it, balancing long term protection against sea level rise with the beach width, water access and open space the community values.
Our approach
The first question was where the line of protection should sit, weighing the beach width the community values against the limited space between the foreshore and the street. Much of the detailing followed from that balance. The design was based on coastal modelling and ground investigation and set against the conditions expected over its design life, including sea level rise. It also allows for future adaptation, so protection can be added to as conditions change. Access, paths and amenities were set into the structure at locations the community nominated, and the works are staged so the foreshore keeps working while it is rebuilt.
The outcome
The design delivers continuous protection along the township foreshore, informed by wave overtopping assessment and able to be adapted as sea levels rise. A shared use path, beach access and rest points are integrated along the top, including accessible access near the cafe precinct. The District Council of Tumby Bay is left with a foreshore designed to hold its line against coastal erosion and storm inundation for decades, and one that is more usable and better connected than the foreshore it replaces.
Project gallery
Similar work
Talk to us about a similar project, or browse more of our work.