West Beach temporary sheet pile wall design

Magryn were engaged by the contractor to design temporary works to facilitate the construction of the coastal protection works in front of the West Beach Surf Life Saving Club.

Temporary sheeting piling was required to prevent tidal inundation and wave attack within the works area.

Magryn’s involvement showcases the firm’s capability to address site-specific challenges. By providing an effective and safe solution, Magryn played a crucial role in ensuring the success of the overall project. This project exemplifies the firm’s commitment to engineering excellence and problem-solving in dynamic coastal environments.